Viernes, 22 Novembre 2019
 

THE COMPLETION OF DANUBE BRIDGE 2 IS PART OF THE POSITION OF THE COUNTRY FOR THE DANUBE STRATEGY - n.p. “ Vidinski most “, 25.03.2010


The former negotiator for the accession of Bulgaria to the European Union Bridgit Chernota and Belin Mollov an Advisor of the Minister of the Regional Development and Public Works were among the instructors at a forum for the working out of the Danube strategy, that was held last Monday in Vidin. The meeting was organized by the “Open society” Institute, Association “European extent 21 Century” and “Double base” group, located in Brussels and orientated to making a net organization for developing the region of the downstream of Danube river.
The strategy of the European Commission for the development the Danube region is expected to be approved in December this year. It includes the 10 Danube countries and another four-neighboring ones – Czech Republic, Slovenia, Bosnia and Hertzegovina and Montenegro. In the position of Bulgaria for the Danube strategy, besides the construction of the installation between Vidin and Calafat, are included reconstruction of Danube Bridge 1, Ruse – Gurgu, as well as the construction of a third bridge over the Danube, between Bulgaria and Romania, at Oriahovo or Silistra.
Belin Mollov emphasized on the importance of the European transport corridors for shaping out the strategy. Corridor No 4, passing though Vidin is the connection from Budapest to the Aegean Sea.


 
EU
45303