Tuesday, 17 October 2017
 

News of Danube bridge 2

The long-awaited day for Danube Bridge Vidin Calafat, 14.06.2013
The longest Bridge over the Danube was inaugurated today in the presence of: the European Commissioner, senior officials from Bulgaria and Romania
read more
FCC handed over the bridge to the Construction Supervision, 05.06.2013
With today’s signing of Act 15, the company Contractor of Danube Bridge Vidin-Calafat, FCC Construccion, handed over the bridge to the Engineer (the Construction Supervision) of the Project
read more
The Construction of Danube Bridge Vidin-Calafat – unbreakable, 26.05.2013
Two-day speed and loading trial tests of the motorway and the railway Danube bridge Vidin-Calafat
read more
Along the Bridge to the European Road System, 22.05.2013
The official German delegation from Region Ortenau, The Federal Republic of Germany, visited Danube Bridge Vidin-Calafat
read more
Students visited the exhibition at Danube Bridge Vidin –Calafat, 13.05.2013
Students from the University of Architecture, Civil Engineering and Geodesy – Sofia were among the first visitors of the 999th consecutive exhibition of the Vidin photographer Bogomil Petrov
read more
Rails connected Danube Bridge 2 with Romania, 10.04.2013
FCC Construccion connected the railway line Danube bridge Vidin-Calafat with the one in Romania, installing the last units of the railway
read more
Danube Bridge 2 Will Draw Bulgaria and Hungary Closer, 18.03.2013
This is the opinion of the Ambassador, Extraordinary and Plenipotentiary of Hungary in Bulgaria, Hon. Andras Klein, after today’s visit to the bridge at Vidin – Calafat
read more
The assembly of the vessels impact protections of the bridge at Vidin has been completed, 15.03.2013
Around each of the four columns in the navigable channel of the Danube are installed 19 pairs of protections against impacts of vessels and heavy objects
read more
FCC supported the initiative of “Shalom”, 07.03.2013
The Constructor of Danube Bridge Vidin-Calafat – FCC Construccion supported the initiative “Do good” of the Jewish organization in Bulgaria “Shalom”
read more
Baba Marta at Danube Bridge Vidin Calafat, 01.03.2013
The construction of the drainage system of the bridge, which includes installation of the drainage pipes under the superstructure of the bridge and the construction of a cascade on the Bulgarian side at PB2, has been fully completed
read more
The Finishing Works at Danube Bridge Vidin - Calafat Are Going on, 01.03.2013
The construction of the drainage system of the bridge, which includes installation of the drainage pipes under the superstructure of the bridge and the construction of a cascade on the Bulgarian side at РВ2, has been fully completed
read more
Barroso will open /launch the Danube Bridge Vidin-Calafat on 9th May, 06.02.2012
For the fourth consecutive time the Management team of FCC Construccion met the Prime Minister of Bulgaria, Boyko Borisov, who came to inspect the construction of the bridge, accompanied by the Minister of Information Technologies and Communications, Ivailo Moskovski
read more
British Diplomats at Danube Bridge Vidin-Calafat, 28.01.2013
“Congratulations on your wonderful achievement!” - was the spontaneous reaction of Catherine Barber, Deputy Ambassador in the British Embassy after seeing the longest bridge over the Danube
read more
The Pelicans Hibernate at Danube Bridge Vidin-Calafat, 22.01.2013
For the first time a flock of pink pelicans have to spend the winter in Vidin, choosing the partitioned non-navigable section of the river within the area of the constructed bridge
read more
What was completed and what remains to be completed at Danube Bridge Vidin – Calafat, 20.12.2012
In 2012 the Constructor of Danube Bridge Vidin-Calafat – FCC Construccion completed and handed over the ownership of the Adjoining Infrastructure of the bridge to the Construction Supervision
read more
Engineers compared the works at Danube Bridge Vidin-Calafat with the European standards, 09.11.2012
A designers’ interest provoked the participants to come to the specialized training on the new regulations for construction products and the standards in the EU of the constructed bridge between Vidin-Calafat
read more
First Asian Ambassador visited Danube Bridge 2 26.10.2012
His Excellency Dr. Chun Beeho, Ambassador of the Republic of Korea visited the construction site of Danube Bridge Vidin Calafat to get acquainted with the progress of the construction of the road and railway facility
read more
The joining of Danube Bridge Vidin-Calafat happened, 24.10.2012
The European Commissioner for Regional Policy , Johannes Hahn, said during today’s visit of the second bridge over the Danube that the joining of “The Danube Bridge” between Vidin and Calafat
read more
German visit to the construction site of the Danube Bridge between Vidin and Calafat - 20.10.2012
During his visit Wolfgang Michels, desk officer for Bulgaria at the Federal Ministry for Economic Cooperation and Development of the Republic of Germany, expressed his satisfaction that the last technical difficulties
read more
Minister Moskovski inspects Danube Bridge Vidin-Calafat, 03.10.2012
The Minister of Transport, Information Technologies and Comunication Ivailo Moskovski thanked the Constructor and the Engineer for the “Serious progress in the construction of the Brigde for the last several months”
read more
The Adjoining Infrastructure to Danube Bridge Vidin-Calafat - Completed, 29.09.2012
All the eight road and railway overpasses of the Adjoining Infrastructure to Danube Bridge are now open to traffic. Four of them pass over the railway lines and the other four connect various road destinations
read more
A New Bridge for Rapport in Between People, 17.09.2012
The District Governor 2482 of Rotary International started his tour in our country from Danube Bridge Vidin-Calafat, promising to take a piece of the new symbol of Bulgaria to all the 86 clubs
read more
Diplomatic walk under the Danube bridge Vidin-Calafat, 13.09.2012
Representatives from ten Embassies in Bulgaria visited the construction site of the second bridge in the Bulgarian section of the Danube
read more
Cycling tour of Danube Bridge Vidin-Calafat, 20.08.2012
The cyclists, participants in the third stage of the European cycling tour along the Danube, 2012 closely acquainted with the progress of construction of Danube Bridge between Vidin-Calafat
read more
The low river level does not prevent the construction of Danube bridge Vidin-Calafat, less than 55 m remain to its connecting with the Romanian bank, 15.08.2012
The construction of the middle diaphragm, which “tightens” the protective elements at pier PB9, has begun (in the navigable channel of the Danube river).
read more
Young Photographers from “The Bridge” Prepare an Exhibition for Danube Bridge Vidin-Calafat, 19.07.2012
The participants in the workshop “Photography” in this year’s youth festival “The Bridge”, which is held for the third consecutive year in Vidin, took dozens of photographs of the constructed bridge between Bulgaria and Romania 
read more
“Yulangelo” sang for the good luck of the bridge, 17.07.2012
One of the emblematic Bulgarian vocal groups - “Yulangelo” sang Virgin Mary’s hymn for the good luck of the Danube Bridge Vidin-Calafat 
read more
Enhanced engineering interest to Danube Bridge Vidin-Calafat, 09.07.2012
The members of the Chamber of Engineers in the Investment Design (CEID) in Bulgaria continue the visits of the construction site of the bridge over the Danube Vidin-Calafat
read more
The bridge opened doors for the third time, 06.07.2012
The Open Door Day again gathered more than 60 people, willing to see the construction of Danube Bridge Vidin-Calafat. And for the first time people arrived from Sofia, as well as English people who have chosen to live in Bulgaria
read more
06.07.2012 – Open day Come and see Danube bridge 2!
06.07.2012 – Open day Come and see Danube bridge 2!
read more
Danube Bridge Vidin-Calafat – an Important Symbol for Europe, 30.06.2012
The Commissioner for Regional Policy of the European Union Johannes Hahn and the Prime Minister of Bulgaria Boiko Borisov were acquainted with the construction of the second bridge over the Danube
read more
European Integration in Action, 27.06.2012
This is what the MEP /Member of European Parliament/, Slavi Binev, said when he saw the construction of Danube Bridge Vidin-Calafat today at his visit at the site
read more
Danube Bridge Vidin-Calafat and “Green Europe”, 13.06.2012
Students from Poland and Bulgaria, united by the Project “Green Europe Depends on Our Eco-Consciousness”, were introduced to the protection of water and environment during the construction of the bridge between Vidin and Calafat
read more
The Ambassador of France in Bulgaria visited Danube Bridge Vidin-Calafat, 08.06.2012
His Hon. Philippe Autie - the Ambassador of France in Bulgaria, visited the construction of Danube Bridge Vidin-Calafat, accompanied by a delegation of the French Embassy, which consisted of Mathieu Bruchon – economic advisor and deputy head of the regional economic service and Xavier Vogt an intern in the Embassy
read more
Before the Completion of Danube Bridge Vidin – Calafat, 29.05.2012
The participants in the sixth meeting of the Bulgarian-Romanian Monitoring Subcommittee, held today in Vidin, inspected the progress of the construction of the cross-border road and railway facility
read more
Educational practice at Danube Bridge Vidin-Calafat, 12.05.2012
Fourth year students from the University of Architecture, Civil Engineering and Geodesy – Sofia, held an educational practice in the subject “Construction of transportation facilities” at the construction site of Danube Bridge Vidin-Calafat
read more
A ninety-year old construction worker saw Danube Bridge exactly on his birthday, 19.04.2012
The second consecutive meeting between the Directorate for National Construction Supervision (NCSD) – Bulgaria and the Regional Directorate in Construction (RDC) Oltenia, Romania, took place today in Vidin
read more
Bulgarian – Romanian Construction Supervision of Danube Bridge Vidin-Calafat, 03.05.2012
All his life he worked as a construction worker at regional and national construction sites and he takes pride in pronouncing the names of „Vidachim” – Vidin
read more
A Team of the First German TV Went Along the Bridge at Vidin, 02.04.2012
For a third time the team of the German TV shot reportage for the construction of Danube Bridge Vidin-Calafat. After two broadcasts of “Deutsche Welle” at the beginning of 2011 and 2012, the German ARD TV visited the construction site of the Project
read more
Minister Moskovski and Minister Donchev walked along 744 m of the Danube Bridge Vidin-Calafat, 26.03.2012
Another consecutive visit was made by the Minister of Transport, Information Technologies and Communications, Ivailo Moskovski and Tomislav Donchev, Minister of EU Funds Management, to monitor the process of construction of the only of its kind in Bulgaria combined road and railway bridge at Vidin-Calafat
read more
FCC Erected the Last Pier of the Bridge at Vidin, 21.03.2012
The last pier ;PB12 of Danube Bridge Vidin-Calafat reached its utmost height – the fourth in the navigable channel of the river. The pier is 44, 76 m high. There are 24 piles in its foundation at a depth of up to 78 meters
read more
The segments at pier PB11 of Danube Bridge Vidin-Calafat are being lifted, 27.02.2012
The assembly of the segments of the superstructure of the bridge Vidin-Calafat was started at pier ??11 in the navigation channel of the river
read more
Parliamentary approval of the changes in the foundations of Danube Bridge Vidin-Calafat, 27.01.2012
With absolute majority, the National Assembly decided today to support the Minister of Transport, Information Technologies and Communications, undertaken for the execution of the Contract for designing–construction works of the bridge over the Danube River at Vidin-Calafat
read more
Vessel impact protections at the last pier of Danube Bridge Vidin-Calafat, 20.01.2012
The assembly of the vessel impact protections has begun at the last pier of Danube Bridge Vidin-Calafat. Pier PB12 is the closest one to the Romanian bank. A total number of 19 pairs of the vessel protections will be assembled at the four piers of the bridge in the navigable channel of the river
read more
A Christmas Tree of Cubes at Danube Bridge Vidin-Calafat, 16.12.2011
An unusual Christmas tree of concrete cubes was made by the employees of the Laboratory at Danube Bridge Vidin-Calafat construction site
read more
A New Section of the Railway Track to the Danube Bridge Vidin-Calafat, 12.12.2011
High voltage of 25 000 V was launched today on the 9750 m of railway track from freight Station Vidin in the direction to Danube Bridge Vidin-Calafat. This is the second section of the new railway track which is built within the project
read more
FCC erected pier PB11, 18.11.2011
Pier PB11 of Danube Bridge Vidin-Calafat reached the utmost height – the third one out of four in the navigable channel of the river. The pier is 43,30 m high. There are 24 piles in its foundation at a depth of up to 78 meters
read more
The first stay cables of Danube Bridge Vidin-Calafat, 10.11.2011
The installation of the first pair of stay cables of the unique, in Bulgaria, combined railway cable-stayed bridge over the Danube at Vidin-Calafat has started. The beginning is at the eighth pair of segments of the superstructure of the bridge at pier PB9, which are among the most loaded
read more
24-hour work shifts at Danube Bridge Vidin-Calafat, 4.11.2011
68% of the construction works at Danube Bridge Vidin-Calafat, included in the Contract has already been executed. The production site for the needs of the construction of the bridge, situated on the territory of the Free Zone Vidin Ltd., operates at full capacity
read more
Discovery Channel shoots a film about Danube Bridge Vidin-Calafat, 27.10.2011
For the first time a team of the of the world famous “Discovery Channel” arrived in Bulgaria to shoot the construction of the bridge at Vidin and Calafat
read more
College Students from the Canary Islands Shared Experience with FCC Construccion, 10.10.2011
A group of college students, studying “Administration and Management” in the “AIES Feria del Atlantico” had a meeting with the Head of administration of the project “Danube Bridge Vidin-Calafat” Felipe Bueso to get acquainted with the work of the administration
read more
ITV Wales, UK at Danube Bridge Vidin-Calafat, 15.09.2011
Nick Powell, Colin Stevens, Sophia Terzieva shot a film about the construction of Danube Bridge Vidin- Calafat, which will be broadcast in October this year on at ITV Wales.
read more
The segments at pier PB10 of Danube Bridge Vidin-Calafat are being lifted, 31.08.2011
The assembly of the segments of the superstructure of the bridge Vidin-Calafat was started at pier PB10 in the navigation channel of the river
read more
A new stretch of the adjoining infrastructure to Danube bridge Vidin-Calafat is being covered with asphalt, 31.08.2011
The covering with asphalt of road junction - Bregovo, type “semi-clover leaf”, was started. The road junction includes part of the direct routes to Calafat –Sofia and Vidin-Bregovo and other road junctions in the direction of Vidin-Calafat, Sofia-Vidin-Kula and others, with total length of over 2000 meters
read more
Ivaylo Kalfin MEP for the third time at the bridge,19.08.2011
The Chairman of the Budget Committee in the European Parliament and MEP from Bulgaria Ivaylo Kalfin with interest followed the progress of the construction of the biggest Bulgarian Project – “Danube BridgeVidin-Calafat”
read more
The European Investment Bank realized their consecutive monitoring of the Project “Danube Bridge Vidin-Calafat, 18.08.2011
The third consecutive monitoring of the progress of the Project “Danube Bridge Vidin-Calafat”
read more
Professional interest of the Russian bridge builders, 29.07.2011
Engineers from “TransKapStroi” and the “Designers Institute” – Moscow got acquainted with the construction of Danube Bridge Vidin-Calafat
read more
Bridge to the Future, 18.07.2011
It is the name the 80 Bulgarian engineers, who got acquainted with the progress of the construction of the grandiose bridge, gave it
read more
German delegation at Danube bridge Vidin-Calafat, 05.07.2011
Representatives of the town of Ulm, Germany, closely examined the structure of the bridge over the Danube at Vidin-Calafat, constructed by the Spanish company FCC Construccion
read more
For a second consecutive year – Open day of Danube bridge Vidin-Calafat, 01.07.2011
Nearly 70 citizens visited the construction site of the unique cross-border railway installation, the adjoining infrastructure and the production site of FCC Construccion
read more
H.E. the Ambassador of the Kingdom of Spain in Bulgaria visited Vidin, 23.06.2011
H. E Mr. Rafael Mendivil, accompanied by Mrs. Eva Povedano, trade-economic problem adviser, Head of the commercial service in the Spanish Embassy in Sofia, met with the largest Spanish colony in Bulgaria
read more
01.07.2011 – Open day
You are welcome to see what FCC Construccion has constructed so far under the project “Danube bridge Vidin-Calafat”!
read more
Danube Bridge Vidin-Calafat progresses in the navigable channel of the Danube river, 17.05.2011
Thus the Chamber of Engineers in Investment Projects in Bulgaria defined the importance of the only one of its kind, in Bulgaria, cable-stayed road and railway bridge at Vidin – Calafat, constructed by the Spanish company FCC Construccion
read more
Danube Bridge Vidin-Calafat progresses in the navigable channel of the Danube river, 17.05.2011
The assembly of the segments from the superstructure of the bridge Vidin-Calafat was commenced in the navigable channel of the river at Pier PB9
read more
The Prime Minister Saw Danube Bridge Vidin-Calafat by Air and Land 15.05.2011
The Managing team of FCC Construccion, Executor of the Project Danube Bridge Vidin-Calafat was the host of the special visit of the Prime Minister of the Republic of Bulgaria, Boiko Borisov
read more
The Project “Danube Bridge Vidin-Calafat” at the exposition “Europe for us”, 13.05.2011
Tomislav Donchev, the Minister of Managing the European Funds, opened today in Sofia the first, of this kind, conference and exposition, initiated for the operational programs of the Republic of Bulgaria, financed by the structural and cohesive funds of EU
read more
Danube Bridge 2 in the TV7 News, 19.04.2011
The Deputy Manager of the project “Danube Bridge Vidin-Calafat” – eng. Julio Ruiz presented the progress in the construction of the cross-border road and railway installation to a team of the news emission of TV7
read more
FCC has picked up the pillar PB10, 06.04.2011
The height of pier ??10 at Danube Bridge Vidin-Calafat – the second of all the four piers in the navigable channel of the river, reached its threshold. The pier is 40, 98 meters high
read more
3000 km form Spain, 19.03.2011
Students from the Polytechnic University of Madrid realized their first practice abroad at the construction of Danube Bridge Vidin-Calafat
read more
More bridges over the Danube, 18.01.2011
A team from “Deutsche Welle” TV visited the construction site of Danube bridge to shoot a reportage for the program “European Journal”, in connection with the forthcoming accession of Bulgaria and Romania to the Schengen zone
read more
More bridges over the Danube, 18.01.2011
The journalist Ladislav Tsvetkov and the cameraman Tomislav Mihailov visited the construction site of Danube bridge Vidin-Calafat
read more
More bridges over the Danube, 18.01.2011
A team of the French TV “Le Bloguer”- Arte shot a film for the construction of Danube Bridge Vidin-Calafat. The journalist Klara Wyrzykovska and the cameraman Jean-Pier Vesperini arrived from Paris
read more
A German Delegation Visited Danube Bridge 2, 29.04.2010
BTV team shot the nearly 60% completed bridge over the Danube at Vidin-Calafat and the 50% constructed Adjoining Infrastructure to it
read more
FCC let the traffic in one section of the first road junction, 14.12.2010
A section of 600 m of the new road junction at Vidin Entrance is already in use. The traffic along the main direction Sofia-Calafat is realized under the newly-built overpass
read more
FCC completed the construction of the overpasses, 09.12.2010
The concreting of the last road slab of all the eight overpasses of the Adjoining Infrastructure to Danube Bridge Vidin-Calafat was completed
read more
FCC waved the flag over the erected pier PB9, 24.11.2010
The construction of pier РВ9 of Danube Bridge Vidin-Calafat in the navigable channel of the river was completed.  The pier is 38,68 meters high. There are 24 piles in its foundation at a depth from 68 to 80 meters
read more
“FINANCIAL TIMES” for the first time in Vidin to see the bridge, 19.11.2010
Two journalists from the 100-year old newspaper arrived  in the north-western district  of Bulgaria, Vidin to see the construction of Danube bridge Vidin-Calafat, and to speak with the Manager of the Project – eng. Alberto Bergara
read more
The last segment of the superstructure, 16.11.2010
The assembly of the last segment of the superstructure of Danube Bridge Vidin-Calafat in the non-navigable channel of the river was completed – from the first to the eight pier. The total number of the assembled concrete segments is 29
read more
Before the meeting of the Joint Bulgarian-Romanian Committee, 05.11.2010
Eng. Rafael Huerga, Deputy Project Manager of FCC Construccion, met the District Governor of Vidin District Plamen Stefanov and Vidin Mayor – eng. Rumen Vidov at the construction site
read more
here isn’t such a big bridge in Switzerland – 16.10.2010
The seventh international conference of the bridges over the Danube river, which was held from 14 to 16 October in Sofia and Vidin, brought to the construction site of the Danube Bridge Vidin-Calafat about 80 engineers, architects, professors and students from the University of Architecture, Civil Engineering and Geodesy – Sofia
read more
here isn’t such a big bridge in Switzerland – 16.10.2010
The seventh international conference of the bridges over the Danube river, which was held from 14 to 16 October in Sofia and Vidin, brought to the construction site of the Danube Bridge Vidin-Calafat about 80 engineers, architects, professors and students from the University of Architecture, Civil Engineering and Geodesy – Sofia
read more
With much love about one good cooperation between Romania and Bulgaria, 07.10.2010
These were the words with which the Minister of Transport and Infrastructure, Mrs. Anka Boagiu, concluded the bilateral meetingbetween the her and the Minister of Transport, Information Technologies and Communications of the Republic of Bulgaria
read more
Veteran tourists from all over Bulgaria crossed the country to see Danube Bridge Vidin-Calafat, 24.09.2010
Representatives of tourist clubs from Russe, Dupnitsa, Montana, Vidin, Berkovitsa and other towns, watched with great interest the new giant over the European river
read more
The longest one after the Trayanov bridge 18.09.2010
After Apolodor of Damask nobody has constructed such a long bridge over the Danube, as the one at Vidin-Calafat”- said Eugen Georgescu, District Governor of District Dolj, Romania
read more
„We need more bridges!”, 26.08.2010
These were the conclusive words of the Minister for EU Funds Management Tomislav Donchev who visited today the sites under the Project “Danube Bridge Vidin-Calafat”
read more
Governors Took Pieces of Danube Clay as a Keepsake of the Bridge, 04.08.2010
The district governors of Vratsa, Montana and Vidin visited the construction site of Danube Bridge Vidin-Calafat and saw what has been constructed so far.
read more
A Brussels Team of Documentary Makers Shot a Documentary about Danube Bridge Vidin-Calafat, 04.08.2010
A team of documentary makers from the Belgian agency “Tipik” shot part of a documentary series “Projects in the Danube Region, Financed by the European Union”
read more
"Danube bridge 2 may be completed in 2011 and put into operation in 2012", 14.07. 2010, Radio „Vidin”
The third meeting of the Bulgarian-Romanian sub-committee for supervision of the Project for the construction of Danube bridge 2 was held in Calafat
read more
The bridge “opened its doors”, 11.06.2010
The Open door day of Danube bridge Vidin-Calafat gathered about 80 people, willing to see the construction site and the adjoining infrastructure on the Bulgarian territory
read more
Hungarians visited Danube bridge 2, 09.06.2010
Post-graduates from Istvan Szechenyi University, the town of Gyor, Hungary, visited the construction site of Danube bridge Vidin-Calafat, led by Ph. D. Tamas Hardi from the Hungarian Academy of Sciences
read more
The Romanian Minister of Transport visited Danube bridge 2, 03.06.2010
The Minister of Transport and Infrastructure of Romania, Mr. Radu Berceanu, today visited the constructed part of the Adjoining Infrastructure on the Romanian territory under the project “Danube bridge Vidin-Calafat”. He visited the site, constructed by FCC Construccion on the Romanian bank – Abutment 3 of the railway-road transport installation
read more
Open day Come and see Danube bridge 2!
You are welcome to see what FCC Construccion has constructed so far under the project “Danube bridge Vidin-Calafat”! You are welcome to see one of the most imposing construction sites in Europe and the biggest in Bulgaria!
read more
A German Delegation Visited Danube Bridge 2, 29.04.2010
Eng. Alberto Vergara, Manager of the Project “Danube bridge Vidin-Calafat”, has met today the German delegation, led by Frank Scherer, District Governor of district Ortenau, Baden-Wьrttemberg and accompanied by Plamen Stefanov, District Governor of Vidin district.
read more
EC gave us 2 years extension of time for 227 million euros under ISPA programme - n. p. “Sega”, 23.04.2010
The European commission has extended with two years the term for the putting to use of the 227 million euros under ISPA programme, which expires at the end of this year. The extension of time helps Bulgaria not to lose the funding for the construction of Danube Bridge 2 and six important ecological projects
read more
THE COMPLETION OF DANUBE BRIDGE 2 IS PART FROM THE POSITION OF THE COUNTRY FOR THE DANUBE STRATEGY - n.p. “ Vidinski most “, 25.03.2010
The previous negotiater for the incorporation of Bulgaria to the European Union Bridgit Chernota and Belin Mollov a Counsellor of the Minister of the regional development and Public Works were among the instructors of a forum for the working out of the Danube strategy, that was held last Monday in Vidin
read more
27.02.2010 - BORISOV AND BOK ARE NOT PLEASED WITH DANUBE BRIDGE 2 - “TRUD”, 27.02.2010
“Who is responsible for the Danube Bridge 2 is not going to be completed at the end of 2010?” This question Boiko Borisov asked several times the Spanish constructors of the bridge from FCC. Together with his Romanian colleague Emil Bok he was acquainted with the work of the second bridge at Vidin – Calafat
read more
15.02.2010 - The “Pari”, 15.02.2010 DANUBE BRIDGE 2 - AN OBSTACLE FOR THIS GOVERNMENT TOO
Because of the bad weather the Romanians postponed the summit meeting, but Brussels will hardly accept such an argument, in case that the Project delays more
read more
17.12.2009 - The “Vidin”,, 17.12. 2009 UNUSUAL CHRISTMAS TREE AT DANUBE BRIDGE 2
The Bulgarian and the Spanish constructors of Danube Bridge 2 decorated their site with unusual Christmas Tree. It is constructed from concrete cubes, used for testing the strength of the concrete
read more
10.12.2009 - Aleksander Tzvetkov: We move onwards – EU won't stop the subsidy
In the interview with the Minister of The Ministry of Transport, Information Technologies and Communications of the Republic of Bulgaria Alexander Tsvetkov, published in today’s issue of the national daily paper “Trud”, he responds to questions concerning the sanctions of the EU to different Bulgarian projects – airport Sofia, the Projects under ISPA program, the state companies “Port Infrastructure”, in whose assets are included the ports of the Bulgarian section of the Black Sea, and the Bulgarian State Railways (BSR
read more
09.12.2009 - The “Classa”, 09.12.2009 - A concession delays the construction of Danube Bridge 2
The problem with the concession, for extracting the inert materials, needed for the construction work of Danube Bridge 2, should be solved immediately. That was stated by the chief Manager of the project Alberto Bergara at the meeting with the Mayer of Vidin Rumen Vidov and was announced from the Municipality
read more
04.12.2009 - The governor of district Vidin carried on a conversation with the new manager of the project “Danube Bridge 2”
The district governor of Vidin Plamen Stefanov met today the chief Manager of project “Danube Bridge 2” – Alberto Bergara, who recently took the place of the new Manager of the site, from the Spanish company FCC, which is doing the construction works
read more
14.11.2009 - Danube Bridge 2 will be ready in two years’ time
All problems between Bulgaria and Romania, concerning the construction, which were put off for years, are already solved, said the Minister Aleksandar Tsvetkov
read more
 
 
 
EU
20149