Video
A walk along the bridge 15.07.2013
 
Aluminum - thermal weldings along the railway alignment of the Bridge 14.4.2013
A walk along the bridge 10.06.2013
Casting the limiting kerbs of the Bridge at Pier PB12 10.03.2013
Construction of a railroad along the railway route of the Bridge 06.4.2013
A view of the Bridge 10.02.2013
Assembly of a vessel impact protection at pier PB12 24.02.2013
Construction works for the Bridge, 9.12.2012
Assembly of signaling lights at Pier PB9, 16.12.2012
Assembly of the last segment of the bridge superstructure at Pier PB12 (on the Romanian side), 01.09.2012
Construction works for the Bridge, 09.10.2012
Paving of a direct route to the Bridge
Assembly of the cable structures at Pier PB12, 29.08.2012
Construction of the medial diaphragm of the vessel impact protections at Pier PB9
Construction works for the Bridge
“Yulangelo” sang for the good luck of the bridge, 17.07.2012
Concreting of a diaphragm at Pier PB12
Construction works for the Bridge, 10.06.2012
View of the Bridge, 17.06.2012
Construction works for the Bridge, 13.05.2012
Construction works for the Bridge, 03.06.2012
Concreting of a stage of the deck of the bridge superstructure in the navigable channel of the river 18.03.2012
Construction works for the Bridge, 28.03.2012
View of the Bridge 12.02.2012
Assembly of vessel impact protection at Pier PB12 03.03.2012
Constriction works for the bridge 11.12.2011
Constriction works for the bridge 16.01.2012
Constriction works for the bridge 4.12.2011
Constriction works for the bridge 11.12.2011
Assembly of a big segment for the superstructure of the Bridge at PB9 (in the navigable channel of the river). 06.11.2011
Constriction works for the bridge 20.11.2011
Transportation of a segment with an elephant crane 06.11.2011
Transportation of a big segment for the superstructure of the Bridge 06.11.2011
Preparation of the crane installation for assembly of segments for the bridge superstructure at PB10 18.08.2011
Assembly of segments at PB10 04.09.2011
Earth works along the direct route of the bridge 18.08.2011
Tensioning of the bridge structure 18.08.2011
Assembly of a cantilever strut for the segments 14.08.2011
Extraction of filling material for the adjoining infrastructure 18.08.2011
Concreting of a stage of a strut at Pier PB10 01.08.2011
Concreting of elements of the superstructure at Pier PB9 02.08.2011
Assembly of the first segment of the superstructure of the bridge at pier PB9 (navigable channel of the river) 22.05.2011
Reinforcement of the deck of the bridge superstructure 19.06.2011
Concreting of a stage of Pier PB11 10.04.2011
Concreting of a stage of a strut at Pier PB9 17.04.2011
Construction works on the bridge 30.01.2011
Production of a big segment of the Bridge 31.01.2011
Concreting of a pre-cast vessel impact protection of the Bridge 12.01.2011
Execution of a section of the deck of the Bridge. 18.01.2011
05.12.2010 - Concreting of the strut at Pier PB9
19.12.2010 - Reinforcement billet in the reinforcement plant of FCC
14.11.2010 - Concreting of a second stage of the Bridge deck
16.11.2010 - The assembly of the last segment of the superstructure
31.10.2010 - Assembly of pedestrian transition bridge and profiling of the ballast bed along the route of Freight station Vidin
7.11.2010 - Concreting of the last pile capo f the Bridge at Pier PB 12
15.10.2010 - Concreting ? stage of the pile cap at Pier PB11
24.10.2010 - Construction works on the overpasses at road junction “Novo selo”.
26.09.2010 - Concreting of abutment A3 on the Romanian side
11.10.2010 - Execution of trial stone piles at the approach roads of the Bridge
08.09.2010 - Disassembly of the old railway road with a motor fastener machine
14.09.2010 - Re-positioning of the launching girder from PB4 to PB5
18.08.2010 - Reinforcement of a pile cap for Abutment A3 (on the Romanian side)
05.09.2010 - Disassembly of the old railway road with a motor fastener machine
04.07.2010 - Aluminum - thermal welding along the railway route.
16.08.2010 - Assembly of a pair of vessel impact protection of the foundation of Pier PB9
27.06.2010 - Execution of a pile at abutment A3 on the Romanian side
04.06.2010 - Mounting of segments at Pier PB2
26.05.2010 - Construction works in the navigable channel of the Danube river
01.06.2010 - Execution of the first cast- in- situ pile at Abutment 3 (on the Romanian side)
12.05.2010 - Execution of segments in the first span of the Bridge
13.05.2010 - Pre-stressing of the lower cables for the super structure of the Bridge.
23.04.2010 - Assembly of segments in the first opening near Abutment 2
27.04.2010 - Concreting of a second stage of a pile cap at Pier PB 9.
15.04.2010 -  Concreting of a bridge segment.
14.04.2010 -  Assembly of the new railway road.
07.04 2010 Execution of the super structure at railway overpass Bregovo and railway overpass Koshava.
09.04 2010 Disassembly of sheet piles at Pier PB2.

 